<- Back to projects
Douglas, Co. Cork, IrelandResidential Development - Multi-block Apartment Complex

Castle Treasure

Drylining & Ceiling Works. Multi-block apartment development where RO Youth delivered internal metal stud partitions and ceiling systems across the residential blocks.

Project overview

Project facts.

Project
Castle Treasure
Location
Douglas, Co. Cork, Ireland
Type
Residential Development - Multi-block Apartment Complex
Our Role
Drylining subcontractor (partitions & ceilings)
Main Subcontractor
Platt & Railey
Scope of Works
Metal stud partitions + ceiling installation
Status
Completed

Project detail

What the clicked project includes.

01

About Castle Treasure

Castle Treasure is a modern residential development located in Douglas, one of Cork's most desirable suburban areas. The scheme comprises multiple blocks of contemporary apartments set within a landscaped environment, designed to high standards of energy efficiency and liveability.

The development provides much-needed quality housing in the Cork metropolitan area, with units ranging across various configurations to serve a wide range of residents.

02

Our Contribution

RO Youth Construction was engaged by Platt & Railey as a specialist drylining subcontractor on the Castle Treasure project. Our team was responsible for the installation of all internal metal stud partition walls and ceiling systems throughout the residential blocks, covering every floor from ground to top level.

The works required careful planning and coordination with mechanical, electrical, and plumbing trades, as well as strict adherence to Irish building regulations and fire compartmentation requirements. Our team maintained high output and quality throughout the programme, contributing directly to the timely delivery of the project.

Scope delivered

Works performed.

The package below is pulled from the project documentation and kept visible for contractors reviewing comparable work.

  • Installation of metal stud partition walls (drylining) throughout all blocks
  • Ceiling grid and board installation across all floors and apartment types
  • Works carried out to Irish building regulations and BS/EN standards
  • Coordination with main trades (MEP, fire stopping) during fit-out phase
  • Works executed across the full residential development - multiple blocks
  • Subcontracted by Platt & Railey - specialist drylining contractor

Need a crew for a similar package?

Send drawings, marked-up areas or a scope list and RO Youth will review availability for drylining, plastering, ceilings and fitout labour.