<- Back to projects
Fairview Street, Kildare Town, Co. Kildare, IrelandResidential - Victorian-style terrace houses (timber frame)

Fairview Street

Plasterboard & Skim Works. Timber-frame terrace housing finished with external board, internal plasterboard and full skim coat to paint-ready standard.

Project overview

Project facts.

Project
Fairview Street Residential Development
Location
Fairview Street, Kildare Town, Co. Kildare, Ireland
Type
Residential - Victorian-style terrace houses (timber frame)
Developer
Branch Developments
Our Role
Plasterboard & skim plastering subcontractor
Scope of Works
External boarding, internal plasterboard & full skim coat
Status
Completed

Project detail

What the clicked project includes.

01

About the Project

The Fairview Street development in Kildare Town is a residential scheme delivering high-quality Victorian-inspired terrace houses built using modern timber frame construction methods. The project was developed by Branch Developments and comprises a terrace of brick-fronted houses featuring traditional architectural details - pitched slate roofs, chimneys, bay windows, and rendered boundary walls - finished to a high standard for the open market.

Located in the heart of Kildare Town, the scheme benefits from excellent access to local amenities, the Kildare rail station, and the M7 motorway, making it an attractive residential address for commuters and families alike.

02

Our Contribution

RO Youth Construction was engaged by Branch Developments as a specialist subcontractor for the plasterboard and skim plastering works across the full Fairview Street development. Our scope covered the installation of external moisture-resistant plasterboard to the timber frame structure, full internal boarding of all walls and ceilings, and a complete skim coat plaster finish throughout each unit - bringing every house to a paint-ready standard.

The works required precision boarding and finishing across multiple house types and units, maintaining consistent quality and output to support the overall construction programme.

Scope delivered

Works performed.

The package below is pulled from the project documentation and kept visible for contractors reviewing comparable work.

  • External plasterboard installation (pink moisture-resistant boards) to timber frame walls
  • Full internal plasterboard boarding to all walls and ceilings across the development
  • Skim coat plastering to all boarded surfaces - walls, ceilings, and reveals
  • Works carried out across multiple house units throughout the scheme
  • Timber frame structure boarding - rapid, accurate installation to programme
  • High-quality finish achieved ready for painting and final decoration
  • Works subcontracted through Branch Developments

Need a crew for a similar package?

Send drawings, marked-up areas or a scope list and RO Youth will review availability for drylining, plastering, ceilings and fitout labour.