RO YOUTH 089 444 1394
Palas Campus — Iași, Romania
Register

P-08 Iași, Romania · Class A office and mixed-use

Palas Campus

Raised access flooring works within a major Class A office and mixed-use campus in Iasi.

Location
Strada Iancu Bacalu, Iasi, Romania
Role
Fit-out flooring subcontractor
Scope
Raised access / fit-out floor installation
Status
Completed

01 The record

Fit-Out Flooring Works

Everything below is taken from the job itself — who it was for, what the package covered, and photographs from site.

Project
Palas Campus
Location
Strada Iancu Bacalu, Iasi, Romania
Type
Class A Office & Mixed-Use Development
Developer
Iulius Group
Our Role
Fit-out flooring subcontractor
Main Subcontractor
Drywall A&A
Scope of Works
Raised access / fit-out floor installation
Status
Completed

02 The job

01

About Palas Campus

Palas Campus is a landmark Class A office and mixed-use development located in Iasi, Romania, developed by Iulius Group. Part of the wider Palas district - one of the most important urban regeneration projects in Romania - Palas Campus comprises modern office towers designed to international standards, hosting major multinational tenants and technology companies.

The complex features premium leasable office space, retail and dining amenities, underground parking, and extensive landscaped public areas, making it one of the most sought-after business addresses in Eastern Romania.

02

Our Contribution

RO Youth Construction was engaged as a specialist subcontractor by Drywall A&A to carry out fit-out flooring works during the interior finishing phase of Palas Campus. Our team was responsible for the installation of raised access floors - a critical element in modern Class A office fit-out, enabling structured cable management, HVAC distribution, and flexible workspace configuration.

03 Scope delivered

  • Installation of raised access flooring (fit-out floors) across multiple levels of the building
  • Works carried out in close coordination with the main contractor and site management teams
  • High-precision levelling and alignment to meet Class A office fit-out standards
  • Timely execution contributing to the overall project completion schedule
  • Subcontracted by Drywall A&A - a specialist interior fit-out company

04 Site photography

From first fix to finished areas.

1 photographs from this job. Site records, not renders.

Palas Campus

Contact

Send the drawings.

Mark the areas, tell us the dates. We come back with crew availability — and we say straight out if we cannot hold them.