RO YOUTH 089 444 1394
Spring Hotel Shannon — Shannon, Co. Clare
Register

P-11 Shannon, Co. Clare · Hospitality refurbishment

Spring Hotel Shannon

One-floor hotel refurbishment partition package, including room layouts, corridors and door openings.

Location
Shannon, Co. Clare, Ireland
Role
Partition installation subcontractor - 1 floor
Scope
Metal stud partitions + Gyproc boarding - full floor
Status
Completed

01 The record

Partition Works

Everything below is taken from the job itself — who it was for, what the package covered, and photographs from site.

Project
Spring Hotel Shannon - Refurbishment
Location
Shannon, Co. Clare, Ireland
Type
Hospitality - Hotel Refurbishment / Fit-Out
Our Role
Partition installation subcontractor - 1 floor
Main Subcontractor
BD Partition
Scope of Works
Metal stud partitions + Gyproc boarding - full floor
Status
Completed

02 The job

01

About the Project

The Spring Hotel in Shannon, Co. Clare is an established hotel serving the Shannon Airport area - one of Ireland's key aviation hubs.

The project involved the refurbishment and reconfiguration of guest accommodation across a full floor of the hotel, requiring the installation of new internal partition walls to create the updated room and corridor layout. Hotel refurbishment projects require fast, accurate partition installation with minimal disruption to the wider building programme.

Our team worked efficiently to deliver the full floor partition scope within the required timeframe.

02

Our Contribution

RO Youth Construction was engaged by BD Partition to carry out the partition installation works across one full floor of the Spring Hotel Shannon. Our scope included the full metal stud framing to all internal partition walls, including door openings and structural blocking, with Gyproc plasterboard boarded to the partition frames throughout.

03 Scope delivered

  • Installation of all metal stud partition walls across one full floor of the hotel
  • Gyproc plasterboard boarding to one side of all partition frames
  • Works carried out within an active hotel refurbishment programme
  • Partition layout followed hotel room and corridor configuration drawings
  • Close coordination with BD Partition as the main drylining subcontractor
  • Works delivered to hospitality fit-out standards on a live site

04 Site photography

From first fix to finished areas.

4 photographs from this job. Site records, not renders.

Partition boarding with Gyproc - sloped roof section
Partition boarding with Gyproc - sloped roof section
Boarded partition with door opening - night works
Boarded partition with door opening - night works
Spring Hotel Shannon
Spring Hotel Shannon

Contact

Send the drawings.

Mark the areas, tell us the dates. We come back with crew availability — and we say straight out if we cannot hold them.