RO YOUTH 089 444 1394
Sysco Newcastle West — Newcastle West, Co. Limerick
Register

P-13 Newcastle West, Co. Limerick · Food distribution and logistics

Sysco Newcastle West

Commercial logistics facility fit-out with partition runs, moisture-resistant boarding and full tape-and-joint finish.

Location
Newcastle West, Co. Limerick, Ireland
Role
Drylining subcontractor - partitions & tape and joint
Scope
All partition walls + full tape and joint finish
Status
Completed

01 The record

Fit-Out Works

Everything below is taken from the job itself — who it was for, what the package covered, and photographs from site.

Project
Sysco Ireland - Newcastle West Facility Fit-Out
Location
Newcastle West, Co. Limerick, Ireland
Type
Commercial - Food Distribution & Logistics Facility
Client / Brand
Sysco Ireland (food service distribution)
Our Role
Drylining subcontractor - partitions & tape and joint
Main Subcontractor
BD Partition
Scope of Works
All partition walls + full tape and joint finish
Status
Completed

02 The job

01

About the Project

Sysco is one of the world's largest food service distribution companies, supplying restaurants, hotels, healthcare facilities, and other businesses with food, beverages, and kitchen equipment. The Newcastle West facility in Co.

Limerick forms part of Sysco Ireland's distribution network, serving the Munster region. The fit-out of a large commercial distribution and logistics facility involves extensive internal partitioning across large floor areas - including offices, welfare facilities, corridor runs, and ancillary spaces - all requiring moisture-resistant boarding and a clean tape and joint finish suitable for a working commercial environment.

02

Our Contribution

RO Youth Construction was engaged by BD Partition to carry out the partition installation and tape and joint works throughout the Sysco Newcastle West facility. Our team installed all internal metal stud partition walls, boarded all surfaces with moisture-resistant plasterboard, and completed the full tape and joint finishing to all walls and reveals across the facility.

The scale of the spaces involved - including large open commercial areas requiring scissor lift access for high-level boarding - required efficient organisation and consistent output from the team throughout the programme.

03 Scope delivered

  • Installation of all internal metal stud partition walls throughout the facility
  • Plasterboard boarding to all partition walls - moisture-resistant blue/grey board used throughout
  • Tape and joint finishing to all boarded surfaces - walls and reveals
  • Large open-area commercial spaces boarded using scissor lift for high-level work
  • Boarding to corridor runs with multiple door openings
  • Works carried out to commercial food distribution facility standards
  • Subcontracted by BD Partition as specialist drylining installer

04 Site photography

From first fix to finished areas.

6 photographs from this job. Site records, not renders.

Individual room - boarded walls with tape & joint applied
Individual room - boarded walls with tape & joint applied
Large commercial space - boarding with scissor lift access
Large commercial space - boarding with scissor lift access
Open area - moisture-resistant boarding and tape & joint
Open area - moisture-resistant boarding and tape & joint
Corridor with full-length partition run and door openings
Corridor with full-length partition run and door openings
Sysco Newcastle West
Sysco Newcastle West

Contact

Send the drawings.

Mark the areas, tell us the dates. We come back with crew availability — and we say straight out if we cannot hold them.